Hazlehead Energy Centre

CHP Engine at HazleheadHazlehead Flats
CHP Capacity:
212 kWe, 350 kWth

Hazlehead was the second project undertaken by Aberdeen Heat & Power.

The installation of the Combined Heat & Power plant is within an existing school boiler house and the District Heating network is connected to 209 flats in four multi storey blocks, a sheltered housing scheme, Hazlehead Academy and its public swimming pool and the Hazlehead Sports Pavilion.

The public buildings have a different heat profile to the flatted properties and consequently the generator can be run through the whole year (unlike the Stockethill project), thus providing improved efficiency of the scheme and additional revenue from the sale of private wire electricity to the school.

Copyright © 2010-2012 Aberdeen Heat and Power Ltd. All Rights Reserved.